I was away last week as a writer-in-residence at Weymouth Center, where I got to write all day and have meals and great conversation with two dear writer friends. In the evenings we read from our work and gave one another feedback, which is always a valued piece of working alongside other writers.
My project for the week was taking an entire novel down to a 12k word story. Not for the faint of heart, but a valuable exercise in understanding the arc and structure of your novel and how subplots function overall. The last full day of the week I got down to 11,994 words and called that a blazing success. This week, now back at home, I’ll be doing a final read/polish and submitting the piece to a journal.
November Hill got 6 inches of rain in only a few hours while I was away. The usual areas flooded, but the drainage projects we’ve done held and I think overall we’re moving in the right direction with the things we’re doing to help with run-off during these deluge events.
Now that I’m back from Weymouth and into February (daffodils are in full bloom!), it’s time to get to work on spring gardening projects:
-bring in more large stone to slow water flow in front of property
-complete terracing in Poplar Folly and plant native seed mixes
-complete 2 terracing projects in front pasture
-mulch all beds and plantings
-move bluebird houses to better locations
-set up honey bee hives in new locations
-create planting beds in Brown Bunny’s Potager and put in some summer veggies and flowers
This sounds like a lot, but some of these items won’t take much time at all, and the others simply require a concerted effort for a few hours with dear husband. I think we need a few weekends to knock this list out.
At the barn, I’m aiming to:
-remove aging exterior stall doors and move the top halves down (leaving no windows), replacing hinges and wood siding. I’d like to recycle the upper halves and when they eventually need replacing I’ll look at commercial options. These Dutch doors were hand-made by previous owners and while serviceable they have some design flaws.
-raise the barn aisle flooring using stone screenings and put matting wall-to-wall, with wood “jambs” at either end to keep everything in place
-new stall bases in 4 stalls
-new base in both shelters
-spruce up interior stall doors and stall fronts
I’m tempted to move on to another batch of projects but am stopping myself with these two lists! These are the things that need to be done before summer rolls in. If we get all this done, it’s not difficult to come up with additional projects.
Everyone is doing well. The horses and pony and donkeys are happy and healthy. Dogs and cats as well. Humans too! One thing on my mind lately is the aging of Bear Corgi, who is 10 and starting to experience arthritis. In my mind he is an eternal puppy, such a bundle of joy and energy. It’s hard to even think of him as aging and harder still to see him having pain. He’s getting chiropractic adjustment, Adequan injections, fish oil for EPA + DHA, and may go onto a pain med soon. It’s tough when a beloved friend and family member gets old.
Inside, I’ve got two rooms to finishing painting and a plan for nearly every room in the house. It’s endless, but I’m going one room at a time and making myself enjoy the transformation instead of focusing on the end result only, i.e. getting them all done. I tend to want to knock out the list and then move on to yet another list (see above) - but isn’t the joy of life, at least in part, in the doing of the tasks? Especially if you’re doing it yourself. This is my overall project for 2020. Embrace the lists but embrace the doing of the stuff more than checking it off.
Yesterday I took great pleasure in some deep cleaning in the master bedroom and bathroom. All it took was a shift in how I thought about it as I did it. Today I’m pausing to notice the results and appreciate them.
February! I love this month and am happy to have so many good things happening.