Well, we lived through 95% of the house painting. The front porch and front steps are left to do - they got rained out and we ran into the inside work that meant tons of foot traffic via the porch so they will be back next week to finish that up.
Today we lived through the attic HVAC not only being replaced, but being replaced with electric unit instead of the old propane fueled one, and that meant HVAC crew + electrical crew and oh my god, I honestly thought this day would never come to an end.
Five minutes before they were ready to roll out, the downstairs unit failed! The HVAC crew valiantly rallied knowing they needed to fix it for us before they left, and I know they were exhausted after a complex attic replacement in 90+ degree heat.
They determined the drain line was blocked but each time they cleaned it out, the unit ran for 10 minutes and then stopped again. They had to remove entire pieces of the unit in order to look deeper into what was going on. Turned out to be a very clean but very dead mouse.
I think the indoor animals were relieved to finally be let out of their rooms after a 9-hour day. We were all relieved that we made it through this long-dreaded home repair.
So when Pella emailed that they went through the boxes containing our three custom windows and everything looked good but ONE piece was the wrong size, and it would take a month to get that in, I basically said THANK YOU SO MUCH because they were coming Monday morning and I was dreading it after the two weeks of painting and today’s very high intensity attic work.
We all need a month to recuperate and now we have it!
The house looks great, the upstairs is cool, and these things are checked off my list with a big fat black Sharpie. Yay!
4 comments:
I hate when the AC goes out. Glad they found the mouse who was gumming up the works! 🐭
Sounds like you needed a break from everything and you were lucky enough to get it. Sit back and relax for a while.
Totally doing that today!!!
You did an amazing job planning and orchestrating how to manage the impact of all these projects on the November Hill residents.
Thank you!!!
You are welcome. It was difficult but I think we managed pretty well!
Post a Comment